1-3 December 2020 | RAI Amsterdam | Amsterdam, The Netherlands

Case Study in Elektro Ljubjana – Can AI Inspection Replace Human Labour in Fast-Overpass Power Grid Inspections

10 Apr 2019
14:40 - 15:00
AMTRIUM 1

Case Study in Elektro Ljubjana – Can AI Inspection Replace Human Labour in Fast-Overpass Power Grid Inspections

• Overview of power grid survey results – brief introduction of Elektro Ljubljana, previous experiences with helicopter inspections. Initial start of the project.
• Overview of project results – what was expected and what were positive/negative sides of the project
• Overview of the power grid survey from technical side – key characteristics, challenges during execution
• Long term grid requirement – what defects and problems are most crucial for long term usage of fast-overpass inspections?
• AI vs manpower – how did AI models perform in 3D point cloud classification and defect detection
• Drones for such technology in the future?

The Commercial UAV Event for:

 


Construction


Energy & Utilities


Forestry & Agriculture


Infrastructure & Transportation


Public Safety & Emergency Services


Security


Surveying & Mapping

 

Connect:

© Diversified Communications. All rights reserved.